All Case Studies

Case Study front Cover

Case Studies

A leading North American producer of Pulp and Paper recognise the importance of operating their business in a sustainable way.

Case study front cover

Case Studies

A local municipal swimming pool in Australia was using gland packing on the main pool pump.

Case Study Front Cover

Case Studies

A bio-ethanol production plant in Poland was experiencing premature failure of a competitors single seal.

Case Study Front Page

Case Studies

Ongoing reliability issues with their pulp agitator mechanical seals led Australian pulp and paper manufacturer to turn to AESSEAL® for assistance.

Case study front cover

Case Studies

AESSEAL® installed a FGDSS single slurry seal in September 2011. The FGDSS seal is specifically designed for pumping the abrasive slurries.

API Plan 32, Case study front cover

Case Studies

A Malaysian geothermal power generation plant had an unreliable mechanical seal on its geothermal brine injection pump. The new solution eliminated the need for frequent maintenance.

Case Study Front Cover

Case Studies

A mean time between failure (MTBF) of just 2 months meant that costs at over $135,000 AUD for pump maintenance were unacceptably high.

contact