Una empresa minera de Australia se enfrentaba a problemas persistentes debido a fallos en las sellos de una de sus bombas de lodos.

More Industry Related Content

Páginas de productos relacionados

Sistemas de gestión del agua

Related Case Studies

Huge water savings for uranium mine
Improved safety and production efficiency while reducing water consumption
CDPH brings big savings for Botswana company
Reliability upgrade saves over ZAR200,000 in just 10 months of operation
LabTecta FS the answer for gearbox problem
Increased MTBF by more than 700%
Mechanical Seal upgrade improve reliability and saves more than ZAR 580,000
Major savings for SA company