Case Studies

curve-down
Displaying 22 - 28 of 32
ZA flag

Case Studies

A phosphates and phosphoric acid producer in South Africa was having problems with the packing on its phosphoric acid pumps.

ZA flag

Case Studies

A latex producer in South Africa was consuming a large quantity of water in API Plan 54 seal support systems (quench to drain) in 2 pumps.

ZA flag

Case Studies

A major sugar manufacturer at one of its alcohol manufacturing sites were looking to reduce the amount of water consumed on 19 critical pumps at one of its sites in South Africa.

ZA flag

Case Studies

A South African power station were experiencing regular outages leading to expensive downtime along with poor emission control and high energy losses.

ZA flag

Case Studies

A major oil refinery in South Africa had an unreliable mechanical seal on a cooler water pump. Despite competitors trying a number of different seal support system configurations, the seal was failing approximately every 6 to 9 months.

ZA flag

Case Studies

A South African corn miller had an evaportator pump that had poor reliability.

ZA flag

Case Studies

A South African customer had an extremely low MTBF on a top entry mixer where the shaft dealing arrangement was a viton lip seal. The shaft fretting was leading to failures with a MTBF of just 48 hours.