Case Ref
19052021-QBS01
Country
South Africa

A latex producer in South Africa was consuming a large quantity of water in API Plan 54 seal support systems (quench to drain) in 2 pumps.

More Industry Related Content

More API Related Content

Related Products Pages

Water Management Systems

Related Case Studies

Reliability upgrade improves Mean Time Between Failure from 1 week to 8 months.
$10,500 yearly cost saving for Chemical manufacturer
Increased reliability with AESSEAL bearing protection
Saving water, the environment and our customers money
Vertical reactor on PVC reactor - $19,000 savings and swift ROI
DMSF seals halt water leakage
Huge reduction in water usage follows AESSEAL audit
Dangerous oil leak problem solved by LabTecta FS