Case Ref
TD3107949
Country
United Kingdom
A Bottom Entry Packed Gland was allowing water to fall on to the bearing assembly of a pulper at a paper company plant in the west of England. This was resulting in the failure of the bottom bearing, which was happening on average every three months.

More Industry Related Content

Related Products Pages

Radially Divided Seal Range

Related Case Studies

LabTecta puts a stop to eight-year oil leaks
CURC solves leakage problem for Saudi company
RDSX the answer for Czech chemical company
CURC puts an end to leakage problem
Reliability Restored at Egyptian Sugar Refinery
Dual seal cuts costs for UAE company
DMSF seal saves thousands for Australian company
Rapid response saves the day for UK company