Case Ref
TD3109292
Country
Belgium

Summary

Lack of cooling with the existing system, improper installation and faulty alignment was causing a seal at a biofuel plant in Belgium to fail every one to two weeks, and sometimes after as little as one day.

More Industry Related Content

Related Products Pages

Double Monolithic Stationary Flow / Convection
Gas Pressurised / Buffer Systems

Related Case Studies

Improved pump reliability for oil refinery
Preventing steam ingress into the bearing housing
Improving reliability, increasing efficiency
6 times improvement in MTBF for Upstream water injection pump
Improved reliability for new process
AESSEAL achieves major savings for Middle East oil producer
AESSEAL product stops hot oil pump leakage
AESSEAL system improves safety at US plant