Case Ref
3453
Country
Brazil

Following a series of failures using competitor bearing seals and labyrinth seals, AESSEAL® were appointed to focus on a more reliable method of dealing their pumps.

More Industry Related Content

Related Case Studies

Seal upgrades save over US $3.4million in seven years
Lip seal upgrade for US petrochemical plant
Improved reliability for new process
Green light for System Sentry
Major savings follow installation of AESSEAL product
Lower balance temperature and correct alignment the key to longer seal life
AESSEAL lowers the temperature in Montana
Increased reliability saves over 1,500,000 ZAR