Case Ref
CH01556
Country
Qatar

Summary

On a molten sulphur pumping operation, at one of the world’s leading producers of liquefied natural gas (LNG) in Qatar, there was the need for continuous availability on three pumps, one in service, and two on hot standby. Continuing issues with standby pump availability was increasing operational risk as continuous availability could not be ensured.

More Industry Related Content

Related Products Pages

Single Cartridge Seal For Legacy API 610 pumps

Related Case Studies

UK oil refinery close to shutting down following labyrinth seal failure
Increased reliability saves over 1,500,000 ZAR
Seal upgrade improves reliability and saves over US$81k
Fast delivery, reliable solutions.
AESSEAL help a Polyethylene plant save €144,000 in 30 months
Improved pump reliability for oil refinery
System Sentry proves its worth in INEOS field trial