Case Ref
TD3100034
Country
Qatar

Summary

Problems with gland packing prompted a power and desalination plant in the Middle East to turn to AESSEAL® in search of a solution. Because of the high pressure and temperature in which the seal was operating, the company was having to replace the gland packing every six to 12 months.

More Industry Related Content

Related Products Pages

Braided flexible expanded graphite tape

Related Case Studies

DMSF solves reliability issues for Swedish company
CKSA seal ensures reliability for UAE company
Increasing MTBR 366% by upgrading
Eliminating unplanned maintenance with API Plan 32
Solar energy component manufacturer increases MTBF
A 50% MTBF increase whilst sealing a corrosive lime slurry
CDPH & EasyClean boosts MTBF from four months to seven years
AESSEAL quick response cuts delivery times