Case Ref
TD3100034
Country
Qatar

Problems with gland packing prompted a power and desalination plant in the Middle East to turn to AESSEAL® in search of a solution. Because of the high pressure and temperature in which the seal was operating, the company was having to replace the gland packing every six to 12 months.

More Industry Related Content

Related Products Pages

Braided flexible expanded graphite tape

Related Case Studies

Leakage problem solved with STS
A 50% MTBF increase whilst sealing a corrosive lime slurry
CKSA seal ensures reliability for UAE company
AESSEAL quick response cuts delivery times
CDPH & EasyClean boosts MTBF from four months to seven years
Reliability Improved For Waste Energy Company
Catalogue of issues lead to failures on power station valves
Improved Reliability for difficult application