Case Ref
TD3100034
Country
Qatar

Problems with gland packing prompted a power and desalination plant in the Middle East to turn to AESSEAL® in search of a solution. Because of the high pressure and temperature in which the seal was operating, the company was having to replace the gland packing every six to 12 months.

More Industry Related Content

Related Products Pages

Braided flexible Expanded Graphite Tape

Related Case Studies

CDPH & EasyClean boosts MTBF from four months to seven years
Solar energy component manufacturer increases MTBF
Eliminating unplanned maintenance with API Plan 32
A 50% MTBF increase whilst sealing a corrosive lime slurry
Catalogue of issues lead to failures on power station valves
DMSF solves reliability issues for Swedish company
CFFC dual seal solves reliability issues
Reliability Improved For Waste Energy Company