Case Ref
TD3100034
Country
Qatar

Problems with gland packing prompted a power and desalination plant in the Middle East to turn to AESSEAL® in search of a solution. Because of the high pressure and temperature in which the seal was operating, the company was having to replace the gland packing every six to 12 months.