Case Ref
TD3107931
Country
Botswana

Summary

The repeated failure of seals on heater drainage pumps was causing problems for a power generation company in Botswana.

More Industry Related Content

Related Products Pages

Related Case Studies

Reliability Improved For Waste Energy Company
A 50% MTBF increase whilst sealing a corrosive lime slurry
Solar energy component manufacturer increases MTBF
Leakage problem solved with STS & ST
CKSA seal ensures reliability for UAE company
Increasing MTBR 366% by upgrading
Exceptional service saves thousands in lost revenue
CDPH & EasyClean boosts MTBF from four months to seven years