Case Ref
TD3104257
Country
South Africa

Summary

A South African mining company was continually being forced to halt operations at one of its plants when a competitor’s seal persistently failed at start-up.

More Industry Related Content

Related Products Pages

Double Heavy Duty Slurry Seal

Related Case Studies

Reliability upgrade saves over ZAR200,000 in just 10 months of operation
Mining company saves $8 million AUD with AESSEAL system
Increased MTBF by more than 700%
80 million litres of water per year to be saved at Mexican mine
Reduced maintenance and water consumption at Iron Ore Mine
Replacing gland packing reduces cost, and improves reliability
Huge water savings for uranium mine
Reduced Water Consumption Quickly Repays Investment