Case Ref
TD3102689
Country
United Arab Emirates

A waste water company in the Middle East turned to AESSEAL® as a result of the persistent lack of reliability of a competitor’s component seal.

More Industry Related Content

Related Case Studies

Huge savings after LabTecta installation
CSSN guarantees water supply for Spanish town
Improved reliability for Flygt pump
DMSF ends leakage problem for Saudi firm
AESSEAL CURC stops leaks at sewage treatment plant
AESSEAL cures reliability issues at US wastewater facility
Major savings with CKD double seal
Company makes huge savings with AESSEAL system