Case Ref
TD3111727
Country
Saudi Arabia

Summary

The split seal on a transfer pump at a wastewater plant in Saudi Arabia was leaking so badly that sewage was flooding the pumping room. The failures were occurring at less than six-monthly intervals, which the company found unacceptable.