Case Ref
TD3107931
Country
Botswana
The repeated failure of seals on heater drainage pumps was causing problems for a power generation company in Botswana.

More Industry Related Content

Related Products Pages

Related Case Studies

CDPH & EasyClean boosts MTBF from four months to seven years
$40,000 a year saving with LabTecta
Eliminating unplanned maintenance with API Plan 32
A 50% MTBF increase whilst sealing a corrosive lime slurry
Solar energy component manufacturer increases MTBF
Leakage problem solved with STS
Exceptional service saves thousands in lost revenue
Increasing MTBR 366% by upgrading