Case Ref
CH01154
Country
United Kingdom

One of the largest Bioethanol production plants in Europe was having a failure every 2 months on a group of pumps in the distillation area of the plant, costing over £75,000 per outage.

More Industry Related Content

Related Products Pages

Double Monolithic Stationary Flow / Convection
Gas Pressurised / Buffer Systems

Related Case Studies

Price and lead time more than halved
AESSEAL helps significantly reduce downtime
Significant savings with new AESSEAL system
DMSF seal the answer for US company
Savings for US company with AESSEAL DMSF
Improved reliability using dual seal and system
AESSEAL seals the deal
Massive water savings with improved reliability