Case Ref
CH01154
Country
United Kingdom

Summary

One of the largest Bioethanol production plants in Europe was having a failure every 2 months on a group of pumps in the distillation area of the plant, costing over £75,000 per outage.

More Industry Related Content

Related Products Pages

Double Monolithic Stationary Flow / Convection
Gas Pressurised / Buffer Systems

Related Case Studies

AESSEAL’s MagTecta™ a high quality solution
Price and lead time more than halved
Improved reliability using dual seal and system
AESSEAL seals the deal
DMSF improves reliability
Savings for US company with AESSEAL DMSF
AESSEAL upgrade removes safety risk
AESSEAL helps significantly reduce downtime