Case Ref
CH01154
Country
United Kingdom

Summary

One of the largest Bioethanol production plants in Europe was having a failure every 2 months on a group of pumps in the distillation area of the plant, costing over £75,000 per outage.

More Industry Related Content

Related Products Pages

Double Monolithic Stationary Flow / Convection
Gas Pressurised / Buffer Systems

Related Case Studies

La mejora de AESSEAL elimina el riesgo para la seguridad
AESSEAL’s MagTecta™ a high quality solution
AESSEAL seals the deal
Significant savings with new AESSEAL system
Price and lead time more than halved
AESSEAL upgrade removes safety risk
Improved reliability using dual seal and system
DMSF seal the answer for US company