Case Ref
CH01556
Country
Qatar

On a molten sulphur pumping operation, at one of the world’s leading producers of liquefied natural gas (LNG) in Qatar, there was the need for continuous availability on three pumps, one in service, and two on hot standby. Continuing issues with standby pump availability was increasing operational risk as continuous availability could not be ensured.

More Industry Related Content

Related Products Pages

Single Cartridge Seal For Legacy API 610 pumps

Related Case Studies

New orders follow success of AESSEAL installation
MagTecta improves cooling tower fan reliability
Reliability upgrade eliminates unscheduled downtime
Cartridge seal simplifies maintenance and improves reliability
Major savings follow installation of AESSEAL product
MTBF increases by 233%
Improving reliability, increasing efficiency
AESSEAL system eliminates danger of hydrogen sulfide release