• AES Customer focus
curve-down

A 50% MTBF increase whilst sealing a corrosive lime slurry

A coal fired power plant was regular leaking caustic liquid from its Flue Gas Desulphurisation (FGD) pumps causing extensive damage to the pump and surrounding area.


Case Study Reference: CH00763

Country: 
Italy