Case Ref
TD3149671
Country
United Kingdom
Summary
A chemical company in the east of England has saved an estimated $1.1 million in downtime and loss of production after installing a Plan 54 Pumppac and Python Cooler to solve the problem of overheating seals.
More Industry Related Content
More API Related Content