Case Ref
TD3107821
Country
United Kingdom

Summary

Outdated and inefficient gland packing on a slurry pump at a UK salt processing facility was using water at the rate of nearly ten litres a minute.

More Industry Related Content

Related Products Pages

Bi-Metal FIDC™ - Flow Induced Dual Cartridge

Related Case Studies

Reliability upgrade improves Mean Time Between Failure from 1 week to 8 months.
Vertical reactor on PVC reactor - $19,000 savings and swift ROI
Chemical company saves £9,400 and 17,000m3 of water a year
Cost-saving upgrade for SA company
CDSA™ dual seal solves leakage problem for US company
Reliability upgrade reduces seal repair costs
Reliability problem solved by AESSEAL CAPI Dual Seal
Reduced pump failure delivered over $11,000 cost saving in first year of operation