Case Ref
TD3107821
Country
United Kingdom
Outdated and inefficient gland packing on a slurry pump at a UK salt processing facility was using water at the rate of nearly ten litres a minute.

More Industry Related Content

Related Products Pages

Bi-Metal FIDC™ - Flow Induced Dual Cartridge

Related Case Studies

Dual seal cuts costs for UAE company
Reliability upgrade improves Mean Time Between Failure from 1 week to 8 months.
DMSC is worth its salt
540% increase in MTBF rates
Dangerous oil leak problem solved by LabTecta FS
Successful Support System Upgrade Improves Plant Reliability
Reliability upgrade improves Mean Time Between Failure by 5 times
Reliability upgrade improves MTBF 2900%