Case Ref
TD3107821
Country
United Kingdom

Summary

Outdated and inefficient gland packing on a slurry pump at a UK salt processing facility was using water at the rate of nearly ten litres a minute.

More Industry Related Content

Related Products Pages

Bi-Metal FIDC™ - Flow Induced Dual Cartridge

Related Case Studies

AESSEAL upgrade solution improves MTBF and reduces costs
AESSEAL mixer seal solves reliability problem
Efficient seal support system reduces energy costs
Reduced pump failure delivered over $11,000 cost saving in first year of operation
CAPI™ boosts reliability at South African plant
$10,500 yearly cost saving for Chemical manufacturer
Reliability upgrade improves Mean Time Between Failure from 1 week to 8 months.
DMSC is worth its salt