Summary

An Australian coal mine had been using gland packing on their 3 coal slurry transfer pumps and asked AESSEAL® to help improve their reliability. A mean time between failure (MTBF) of just 2 months meant that costs at over $135,000 AUD for pump maintenance were unacceptably high.