Case Ref
TD3115391
Country
United Arab Emirates
A petrochemical company in the Middle East was having problems with the persistent failure of back-to-back seals in a propane mixture pump.

More Industry Related Content

Related Products Pages

Dual Mechanical Seal – Oil & Gas

Related Case Studies

Chemical plant saved over €500,000 in the first year
Unique utilization of the cooling coil solves pump problems.
LabTecta puts a stop to eight-year oil leaks
CURC solves leakage problem at US plant
Standard of service makes AESSEAL a clear winner
Chemical company saves £9,400 and 17,000m3 of water a year
CAPI™ boosts reliability at South African plant
Chemical company saves a months worth of downtime