Case Ref
BOTTS2005
Country
Botswana

The mine’s Warman® F-frame pumps were sealed with gland packing which required 19 US gallons (71 litres) per minute of gland water per pump. The company turned to AESSEAL® for assistance.

More Industry Related Content

Related Case Studies

Mechanical Seal upgrade improve reliability and saves more than ZAR 580,000
Los sensores AVT ahorran miles de dólares a una empresa estadounidense
5 years without failure and a ZAR3.2million saving
CDPH brings big savings for Botswana company
Five times improvement in reliability
Mining company saves $8 million AUD with AESSEAL system
DMSF seal saves thousands for Australian company
LabTecta FS the answer for gearbox problem