Case Ref
BOTTS2005
Country
Botswana

Summary

The mine’s Warman® F-frame pumps were sealed with gland packing which required 19 US gallons (71 litres) per minute of gland water per pump. The company turned to AESSEAL® for assistance.

More Industry Related Content

Related Case Studies

Major savings follow installation of TPDS™ slurry seal
Mining company saves $8 million AUD with AESSEAL system
Improved reliability with reduced water cost
LabTecta FS the answer for gearbox problem
Reduced maintenance and water consumption at Iron Ore Mine
Reliability upgrade saves over ZAR200,000 in just 10 months of operation
Autoclave specialist chooses AESSEAL for reliability and customer service
LabTecta reduces repair costs for Portuguese mining company