Case Ref
TD3104244
Country
United Kingdom

The repeated failures of a single seal with an unreliable Plan 32 were causing a heavy-duty high head slurry pump at a South Wales steelworks to break down on average every three weeks.

More Industry Related Content

Related Products Pages

Dual Mechanical Seal – Oil & Gas

Related Case Studies

Huge savings at Austrian steel mill
Warman conversion the answer for Spanish company
Mayor seguridad y fiabilidad
Zinc Smelting Plant Saves Thousands
AESSEAL upgrade solution leads to an 8 year failure free period
Reliability upgrade improves reliability 700%
Improved Safety and Reliability
LabTecta the remedy for lip seal failures