Case Study TD3126299
Case Ref
TD3126299
Country
Spain
Outdated seal technology from the 1980s was causing problems for a Spanish pharmaceuticals company at its plant in the north of the country.

More Industry Related Content

Related Case Studies

Chemical plant saved over €500,000 in the first year
Reliability upgrade improves Mean Time Between Failure from 1 week to 8 months.
AESSEAL improves reliability at French chemical plant
Chemical Producer Saves Over £1.7 Million in Plant Downtime
CURC solves leakage problem at US plant
Reliability upgrade reduces seal repair costs
AESSEAL repair saves thousands for Saudi company
Upgrade delivers annual saving of 15,000 USD