Case Ref
CH01452
Country
Poland

Summary

A global food and beverage manufacturer was experiencing a mean time between failure (MTBF) of just two months on a vertical mixer processing starch at its starch and sweetener processing plant in Poland.

More Industry Related Content

Related Products Pages

Cartridge Double for Mixers
Water Management Systems
IP66 certified designs that conform to IEEE Std. 841-2021

Related Case Studies

Quality service and technical support for South African contract
Enhanced production reliability
SW2 brings huge water savings for French brewery
Water Savings for South African Corn Miller
Improved reliability and reduced water consumption
Change to packing saves Swiss company $millions
Reduced downtime and health & safety benefits
Dual Seal Upgrade saves over 17 million litres of water