Case Ref
CH01452
Country
Poland

Summary

A global food and beverage manufacturer was experiencing a mean time between failure (MTBF) of just two months on a vertical mixer processing starch at its starch and sweetener processing plant in Poland.

More Industry Related Content

Related Products Pages

Cartridge Double for Mixers
Water Management Systems
IP66 certified designs that conform to IEEE Std. 841-2021

Related Case Studies

Tailored seal solution cuts costs and operational downtime
CKS the right ingredient at Spanish food plant
Dual Seal Upgrade saves over 17 million litres of water
Saving water, energy and money for a food manufacturer
Change to packing saves Swiss company $millions
Reducing water consumption in a food production plant
Annual savings of over $2.6 million
Improving reliability and reducing product loss for sugar Refinery