Case Ref
ROI-2020-096
Country
Namibia

A Namibian uranium mine had 24 Krebbs pumps sealed with gland packing. To operate correctly the packing was flushed with around 5 cubic meters of water per hour. In total the mine used 15,000 cubic meters of water per day at a cost of N$810,000 per day. In addition the packing required regular maintenance and replacement every 2 months. The mine operator approached AESSEAL® for a better solution.


REF: ROI-2020-096

More Industry Related Content

Related Products Pages

Medium to Heavy-Duty Double Slurry Seal
Fluid Distribution Unit

Related Case Studies

Major savings for SA company
Huge cost savings and improved reliability with gland packing upgrade
A $30,000 yearly saving for Australian copper mine
Improved reliability with reduced water cost
Mining company saves $8 million AUD with AESSEAL system
Mechanical Seal upgrade improve reliability and saves more than ZAR 580,000
Reliability upgrade saves over ZAR200,000 in just 10 months of operation
Improved safety and production efficiency while reducing water consumption