Case Ref
CH01001
Country
Poland

A brown coal mine in Poland had lip seals fitted on their intermediate shaft bearing housings. The bearing housing was flooded with oil to about 75% of capacity and this was causing the lip seals to fail every 2 to 3 months.

More Industry Related Content

Related Case Studies

LabTecta puts a stop to eight-year oil leaks
AESSEAL solves reliability problem for US paper company
CURC solves leakage problem for Saudi company
RDSX the answer for Czech chemical company
CURC puts an end to leakage problem
Reliability Restored at Egyptian Sugar Refinery
Dual seal cuts costs for UAE company
Rapid response saves the day for UK company