• AES Customer focus
curve-down

Replacing gland packing reduces cost, and improves reliability

A coal mine in Australia was using gland packing on 3 coal slurry transfer pumps. The gland packing would start to fail after 6 weeks and the yearly maintenance bill for the 3 pumps was over $135,000AUD.


Case study reference: CH00704 - CH00706

Country: 
Australia 

To conform to the following API Plan Types