AESSEAL cuts water usage by 75 percent at US company
Case Ref
TD3100060
Country
United States

A US mining company was concerned that its large end suction pumps  were using excessive amounts of water and that the packing was  damaging sleeves, resulting in high costs for repair and maintenance.  

More Industry Related Content

Related Products Pages

Water Management Systems

Related Case Studies

LabTecta puts a stop to eight-year oil leaks
AESSEAL solves reliability problem for US paper company
CURC solves leakage problem for Saudi company
RDSX the answer for Czech chemical company
CURC puts an end to leakage problem
Reliability Restored at Egyptian Sugar Refinery
Dual seal cuts costs for UAE company
Rapid response saves the day for UK company