Case Ref
TD3100060
Country
United States

Summary

A US mining company was concerned that its large end suction pumps  were using excessive amounts of water and that the packing was  damaging sleeves, resulting in high costs for repair and maintenance.  

More Industry Related Content

Related Products Pages

Water Management Systems

Related Case Studies

AESSEAL system eases cost pressures for African company
Major savings for SA company
LabTecta reduces repair costs for Portuguese mining company
Huge cost savings and improved reliability with gland packing upgrade
Saving over 1 billion gallons of water
Replacing gland packing reduces cost, and improves reliability
New approach for slurry pumps reduces water usage by 95%
Reliability upgrade saves over ZAR200,000 in just 10 months of operation