• AES Customer focus
curve-down

Huge cost savings and improved reliability with gland packing upgrade

Case Study Front Cover

An Australian coal mine had been using gland packing on their 3 coal slurry transfer pumps and asked AESSEAL® to help improve their reliability. A mean time between failure (MTBF) of just 2 months meant that costs at over $135,000 AUD for pump maintenance were unacceptably high.


REF: CH01254
Country: 
Australia 
contact