Featured Case Studies

The case studies below showcase the very best of commitment to excellence at AESSEAL across our three core pillars:

  • Exceptional Customer Service – putting customers first, every time.
  • Advanced Technology – delivering innovation that drives results.
  • Sustainable Solutions – engineering a better future for people and our planet.

LabTecta ends dust pollution problem for SA firm
ZA Flag

Preventing dust from escaping into the working environment and is saving thousands of dollars a year

Chemical plant saved over €500,000 in the first year
FR Flag
A critical glue agitator vessel was affecting productivity for a silicone manufacturing facility in France. This situation was costing the company thousands of Euros in lost production.

Change to packing saves Swiss company $millions
CH Flag

A chocolate producer in Switzerland has saved around ₣2.3 million ($2.6 million) over the past year following its decision to change to an AESSEAL pump packing system.

Annual savings of over $2.6 million
US Flag
A food and beverage customer was experiencing high leakage and contamination in their process fluid on the single pass flow through system they were operating.

DMSF seal the answer at South African plant
ZA Flag
The installation of the AESSEAL DMSF seal and SW2 water management system at the Ford plant in Pretoria, South Africa, has improved the MTBF of a crucial seal from less than two weeks to more than two years.

LabTecta FS the answer for gearbox problem
US Flag
A repair and maintenance company in West Virginia says that its customers in the local coal mining industry have recorded major savings following a decision to upgrade to AESSEAL LabTecta FS.

Chemical Producer Saves Over £1.7 Million in Plant Downtime
GB Flag
A specialty chemical company at its UK processing facility were desperately trying to get spare parts for the mechanical seal on one of its critical reactors.

DMSF makes its mark in Japanese paper industry
JP Flag
The installation of an AESSEAL® DMSF seal at a Japanese paper plant has increased the MTBF from just six months to seven years.

Exceptional service saves thousands in lost revenue
GB Flag

AESSEAL were contacted by a power plant in the UK who were experiencing a major issue with their supply of mechanical seals.

Upgrade will result in major savings for US company
US Flag
A US petrochemical company is set to save tens of thousands of dollars a year following the installation of specially-designed seal pots to replace 40 existing pots which had been in place for around half a century.

AESSEAL product brings big savings for South African company
ZA Flag
The installation of an AESSEAL FGDSS-N single slurry seal is saving a South African mining company thousands of dollars a year in repair and maintenance costs.

Rapid response impresses Saudi customer
SA Flag

Sourced and supplied a replacement seal in just two weeks for customer’s Oil and Gas operation in Saudi Arabi

Staying cool in Cardiff
GB Flag
The cooling system in a High Profile office building in the Cardiff Bay area was operating with just a single duty pump and no standby.

Major reliability improvement with CSSN seals
ZA Flag
Installation of CSSN cartridge seal has resulted in a dramatic improvement in seal reliability for a South African chemical company.

AESSEAL packing system brings major savings
FR Flag

A French pharmaceuticals company has saved over €200,000 in the first year following its decision to change to an AESSEAL reactor packing system.

AESSEAL product ends emissions penalties for Polish company
PL Flag
A Polish Petrochemical Company was paying heavy fines resulting from the escape of harmful solvents into the atmosphere.

CDPH & EasyClean boosts MTBF from four months to seven years
DK Flag
The installation of a CDPH double mechanical seal along with an EasyClean™ seal support system proved to be the remedy for the frequent failures of a competitor’s seal at a power plant in Denmark.

AESSEAL system fixes sewage problems for US township
US Flag

A municipality in Pennsylvania was having issues with major inefficiencies in its sewage treatment system. 

Dangerous oil leak problem solved by LabTecta FS
ES Flag
A silicon lip seal fitted to a rubber lumps reactor at a chemical plant in northern Spain failed after just ten days, resulting in the serious leakage of oil from the gearbox.

Mining company saves $8 million AUD with AESSEAL system
AU Flag
A coal mine in Australia was having seal failures roughly every two weeks on two disposal pumps.

AESSEAL product removes risk of HFC emissions
IT Flag
A specially designed double seal from AESSEAL has enabled an Italian drinks company to avoid the risk of major financial penalties which could have resulted from the release into the atmosphere of highly damaging HFC (hydrofluorocarbon) gases.

FIDC ends costly leaks at US firm
US Flag
The installation of an FIDC seal to replace single seals with no flush or API Plan has dramatically improved pump reliability at a pulp and paper company in New England.

Rapid response saves the day for UK company
GB Flag
The rapid repair of a faulty seal saved a UK pharmaceuticals company almost £2 million in lost production.

AESSEAL solves reliability problem for US paper company
US Flag
The installation of the AESSEAL DMSC double mechanical seal, a close clearance bushing, a FLOWTRUE flowmeter, and a 25 litre SW2 water management system, has solved a problem of repeated seal failure for a US paper company.

Leakage problem solved with STS
GB Flag
A global energy company was facing significant losses as a result of damage to the steam turbine housing at one of its ethylene plants.

Mechanical seals runs an incredible 17 years without problems
ZA Flag
Tongaat Hullett Sugar were un happy with the amount of maintenance required on the sealing of one of its pumps.

Fantastic seal life for notoriously difficult application
CA Flag
A pulp & paper company in the Canada were dissatisfied with the reliability of the mechanical seal used in its Chlorine Dioxide generator pump.

ROI In Less Than A Month
FR Flag
a French cardboard manufacturer was experiencing seal failures every two months. AESSEAL worked closely with the customer to find the right solution.

DMSF solves reliability issues for Swedish company
SE Flag
Elastomer degradation was causing the seals on three of the boiler feed pumps at a Swedish energy plant to fail around every 12 months.

AESSEAL product stops hot oil pump leakage
DZ Flag
A large oil and gas company in north Africa contacted AESSEAL to look at a sealing issue on its hot oil pumps.

New approach for slurry pumps reduces water usage by 95%
CD Flag
A copper mining company in central Africa was encountering problems of excessive water usage

Reliability Improved For Waste Energy Company
GB Flag
Enfinium were disappointed with the support provided by their pump OEM

80 million litres of water per year to be saved at Mexican mine
MX Flag
The Grupo Mexico Caridad mine in Mexico was experiencing lengthy downtimes and using high volumes of water for lubricating pump packing.

Bitumen pump upgrade saves over £23,000 a year
GB Flag

Asphalt producer pump for road surfaces was gland packed and losing over 15 tonnes of bitumen.