Featured Case Studies
The case studies below showcase the very best of commitment to excellence at AESSEAL across our three core pillars:
- Exceptional Customer Service – putting customers first, every time.
- Advanced Technology – delivering innovation that drives results.
- Sustainable Solutions – engineering a better future for people and our planet.
AESSEAL packing system brings major savings
A French pharmaceuticals company has saved over €200,000 in the first year following its decision to change to an AESSEAL reactor packing system.
Rapid response impresses Saudi customer
Sourced and supplied a replacement seal in just two weeks for customer’s Oil and Gas operation in Saudi Arabi
Full steam ahead for refinery after change to STS seals
Reliability Improved For Waste Energy Company
CDSA seals brings huge savings for US company
Leakage problem solved with STS
AESSEAL product removes risk of HFC emissions
DMSC saves Nestlé Purina £182k in just 10 months
Upgrade will result in major savings for US company
Mining company saves $8 million AUD with AESSEAL system
Bitumen pump upgrade saves over £23,000 a year
Asphalt producer pump for road surfaces was gland packed and losing over 15 tonnes of bitumen.
Warman conversion the answer for Spanish company
A seal conversion kit for the Warman® AH Range of Ultra Heavy Duty Slurry Pumps helped to solve a variety of problems being experienced by a Spanish aluminium producer.
Major reliability improvement with CSSN seals
Major savings with CKD double seal
CFFC™ solves reliability problem on North Sea oil platform
New approach for slurry pumps reduces water usage by 95%
Mechanical seals runs an incredible 17 years without problems
Dangerous oil leak problem solved by LabTecta FS
Chemical plant saved over €500,000 in the first year
Major savings follow installation of AESSEAL product
A petrochemical company based in the Middle East was having problems with persistent and costly seal failures.
AESSEAL product ends emissions penalties for Polish company
DMSF seal the answer at South African plant
AESSEAL solves reliability problem for US paper company
CDPH & EasyClean boosts MTBF from four months to seven years
Prompt delivery saves three-month delay
Rapid response saves the day for UK company
AESSEAL help a Polyethylene plant save €144,000 in 30 months
LabTecta FS the answer for gearbox problem
AESSEAL product stops hot oil pump leakage
Major savings follow change to AESSEAL FIDC™
DMSF solves reliability issues for Swedish company
AESSEAL helps UK firm to multi-million pound savings
Seal upgrades save over US $3.4million in seven years
Staying cool in Cardiff
LabTecta ends dust pollution problem for SA firm
Preventing dust from escaping into the working environment and is saving thousands of dollars a year