Case Ref
CH01454
Country
France

A critical glue agitator vessel was affecting productivity for a silicone manufacturing facility in France. The installed mechanical seal was had a life of between 4 and 8 weeks, and replacement required the agitator to be off-line for 7 days. This situation was costing the company thousands of Euros in lost production.

May case study of the month shows how AESSEAL helped a customer facing a week’s lost production every couple of months because excessive radial movement in a mixer paddle shaft was causing seal failure.

More Industry Related Content

Related Products Pages

Canister Double Monolithic Stationary Convection
Gas Pressurised / Buffer Systems

Related Case Studies

Gas seal gives 14 years trouble free operation
LabTecta puts a stop to eight-year oil leaks
Trapeziodal Packing improves reliability 3-fold
Cleaner plant with AESSEAL gland packing
Huge reduction in water usage follows AESSEAL audit
El nivel de servicio convierte a AESSEAL® en el claro ganador
Polish plant benefits from LabTecta protection
Reliability upgrade improves MTBF 2900%