Featured Case Studies
The case studies below showcase the very best of commitment to excellence at AESSEAL across our three core pillars:
- Exceptional Customer Service – putting customers first, every time.
- Advanced Technology – delivering innovation that drives results.
- Sustainable Solutions – engineering a better future for people and our planet.
Rapid response impresses Saudi customer
Sourced and supplied a replacement seal in just two weeks for customer’s Oil and Gas operation in Saudi Arabi
Annual savings of over $2.6 million
Reliability Improved For Waste Energy Company
FIDC ends costly leaks at US firm
Mining company saves $8 million AUD with AESSEAL system
Bitumen pump upgrade saves over £23,000 a year
Asphalt producer pump for road surfaces was gland packed and losing over 15 tonnes of bitumen.
Major savings with CKD double seal
CFFC™ solves reliability problem on North Sea oil platform
80 million litres of water per year to be saved at Mexican mine
Chemical Producer Saves Over £1.7 Million in Plant Downtime
AESSEAL product ends emissions penalties for Polish company
Major reliability improvement with CSSN seals
AESSEAL packing system brings major savings
A French pharmaceuticals company has saved over €200,000 in the first year following its decision to change to an AESSEAL reactor packing system.
CDSA seals brings huge savings for US company
Rapid response saves the day for UK company
Chemical plant saved over €500,000 in the first year
Exceptional service saves thousands in lost revenue
AESSEAL were contacted by a power plant in the UK who were experiencing a major issue with their supply of mechanical seals.