Featured Case Studies
The case studies below showcase the very best of commitment to excellence at AESSEAL across our three core pillars:
- Exceptional Customer Service – putting customers first, every time.
- Advanced Technology – delivering innovation that drives results.
- Sustainable Solutions – engineering a better future for people and our planet.
Chemical plant saved over €500,000 in the first year
Mining company saves $8 million AUD with AESSEAL system
LabTecta ends dust pollution problem for SA firm
Preventing dust from escaping into the working environment and is saving thousands of dollars a year
Rapid response saves the day for UK company
AESSEAL system fixes sewage problems for US township
A municipality in Pennsylvania was having issues with major inefficiencies in its sewage treatment system.
DMSF solves reliability issues for Swedish company
ROI In Less Than A Month
Rapid response impresses Saudi customer
Sourced and supplied a replacement seal in just two weeks for customer’s Oil and Gas operation in Saudi Arabi
AESSEAL help a Polyethylene plant save €144,000 in 30 months
Seal upgrades save over US $3.4million in seven years
80 million litres of water per year to be saved at Mexican mine
LabTecta FS the answer for gearbox problem
DMSF seal the answer at South African plant
Major savings follow installation of AESSEAL product
A petrochemical company based in the Middle East was having problems with persistent and costly seal failures.
Mechanical seals runs an incredible 17 years without problems
Prompt delivery saves three-month delay
DMSC saves Nestlé Purina £182k in just 10 months
CDSA seals brings huge savings for US company
Chemical Producer Saves Over £1.7 Million in Plant Downtime
LabTecta IAP solves ash dust problem
AESSEAL helps UK firm to multi-million pound savings
Major savings with CKD double seal
Full steam ahead for refinery after change to STS seals
Major savings follow change to AESSEAL FIDC™
Change to packing saves Swiss company $millions
A chocolate producer in Switzerland has saved around ₣2.3 million ($2.6 million) over the past year following its decision to change to an AESSEAL pump packing system.
AESSEAL packing system brings major savings
A French pharmaceuticals company has saved over €200,000 in the first year following its decision to change to an AESSEAL reactor packing system.
Dangerous oil leak problem solved by LabTecta FS
Upgrade will result in major savings for US company
LabTecta ends contamination problem at Australian mining company
Warman conversion the answer for Spanish company
A seal conversion kit for the Warman® AH Range of Ultra Heavy Duty Slurry Pumps helped to solve a variety of problems being experienced by a Spanish aluminium producer.