Case Ref
TD3100000
Country
United Arab Emirates

Summary

A chemical company in the Gulf was looking to replace its existing pump single seal, which was continually leaking, and which they were having to replace about once a month. Typically, the replacement seal would begin to leak after just five to ten days.

More Industry Related Content

Related Products Pages

Related Case Studies

DMSF seals halt water leakage
Successful Support System Upgrade Improves Plant Reliability
Dangerous oil leak problem solved by LabTecta FS
AESSEAL mixer seal solves reliability problem
SA firm makes big savings with CDPN
Chemical Producer Saves Over £1.7 Million in Plant Downtime
Reliable solution for high pressure, high temperature agitator application
Reliability problem solved by AESSEAL CAPI Dual Seal