Case Ref
CH01159
Country
United Kingdom

Summary

A chemical plant in the UK was sealing an Aceto Digester feed pump with a dry running gas seal supplied by an AESSEAL® competitor. The seal was unreliable and was failing on average every 3 months at a typical cost of over £3,500 per repair.