Case Ref
CH01159
Country
United Kingdom

Summary

A chemical plant in the UK was sealing an Aceto Digester feed pump with a dry running gas seal supplied by an AESSEAL® competitor. The seal was unreliable and was failing on average every 3 months at a typical cost of over £3,500 per repair.

More Industry Related Content

More API Related Content

Related Products Pages

Universal Dry Gas Seal

Related Case Studies

Chemical company saves £9,400 and 17,000m3 of water a year
Chemical Producer Saves Over £1.7 Million in Plant Downtime
Reliability upgrade improves Mean Time Between Failure from 1 week to 8 months.
AESSEAL mixer seal solves reliability problem
Over 20 million litres of water saved in 5 years for just 2 pumps
AES-Elast successfully replaces leading brand
Reliability upgrade improves MTBF 2900%
Reduce maintenance costs with reliability upgrade