Case Ref
TD3140379
Country
United States

Summary

A prompt response by AESSEAL solved a major problem for a Louisiana chemical company when a pump failed in its EDC area.

More Industry Related Content

Related Case Studies

Cleaner plant with AESSEAL gland packing
Gas seal gives 14 years trouble free operation
LabTecta puts a stop to eight-year oil leaks
LabTecta saves €360,000 for Spanish company each year
Reliability upgrade reduces seal repair costs
Reduced pump failure delivered over $11,000 cost saving in first year of operation
Huge reduction in water usage follows AESSEAL audit
CURC solves leakage problem for Saudi company