Case Ref
TD3140379
Country
United States

Summary

A prompt response by AESSEAL solved a major problem for a Louisiana chemical company when a pump failed in its EDC area.

More Industry Related Content

Related Case Studies

Saving water, the environment and our customers money
Huge reduction in water usage follows AESSEAL audit
AES-Elast successfully replaces leading brand
Reliability upgrade reduces seal repair costs
Reliability upgrade improves Mean Time Between Failure from 1 week to 8 months.
Trapeziodal Packing improves reliability 3-fold
FDGS improves safety and reliability at Spanish company
LabTecta saves €360,000 for Spanish company each year