Case Ref
TD3140379
Country
United States

Summary

A prompt response by AESSEAL solved a major problem for a Louisiana chemical company when a pump failed in its EDC area.

More Industry Related Content

Related Case Studies

Reliability upgrade improves Mean Time Between Failure from 1 week to 8 months.
Improved reliability with AESSEAL packing system
Improved seal face cooling with CDFI range
$10,500 yearly cost saving for Chemical manufacturer
Successful Support System Upgrade Improves Plant Reliability
Chemical plant saved over €500,000 in the first year
Reduced pump failure delivered over $11,000 cost saving in first year of operation
Chemical company saves £9,400 and 17,000m3 of water a year