Case Ref
TD3140379
Country
United States

Summary

A prompt response by AESSEAL solved a major problem for a Louisiana chemical company when a pump failed in its EDC area.

More Industry Related Content

Related Case Studies

540% increase in MTBF rates
Chemical Producer Saves Over £1.7 Million in Plant Downtime
Reduced maintenance after change to mechanical seal
LabTecta the answer for SA chemical company
Superior AESSEAL product and service seals the deal
AES-Elast successfully replaces leading brand
Reliability upgrade reduces seal repair costs
CKD™ saves thousands a year at Spanish chemical plant