Water ingress was causing the gearbox to come out of service
GB flag

Case Studies

A UK based food processing plant was having major water ingress through the vertical shaft on their cold room gearbox.

Gland Packing Case Study
GB flag

Case Studies

Tarmac producer pump for road surfaces was gland packed and losing over 15 tonnes of bitumen.

GB flag

Case Studies

Increasing MTBF from 6 months to 6 years and saving over £137,000

GB flag

Case Studies

Dairy Crest Severnside has more than doubled machine life expectancy and reduced downtime, after replacing standard oil seals with LabTecta® bearing protection seals.

GB flag

Case Studies

One of the largest Bioethanol production plants in Europe was having a failure every 2 months on a group of pumps in the distillation area of the plant, costing over £75,000 per outage.

GB flag

Case Studies

A chemical plant was installing a new conveyor system and the onsite engineer had concerns over the OEM sealing options for the plummer block bearings.

GB flag

Case Studies

A UK based Oil Refinery was having repeated failures on a Coppus 24 Steam Turbine.