Featured Case Studies
The case studies below showcase the very best of commitment to excellence at AESSEAL across our three core pillars:
- Exceptional Customer Service – putting customers first, every time.
- Advanced Technology – delivering innovation that drives results.
- Sustainable Solutions – engineering a better future for people and our planet.
DMSF solves reliability issues for Swedish company
AESSEAL solves reliability problem for US paper company
ROI In Less Than A Month
Fantastic seal life for notoriously difficult application
Rapid response impresses Saudi customer
Sourced and supplied a replacement seal in just two weeks for customer’s Oil and Gas operation in Saudi Arabi
AESSEAL help a Polyethylene plant save €144,000 in 30 months
Prompt delivery saves three-month delay
Staying cool in Cardiff
80 million litres of water per year to be saved at Mexican mine
AESSEAL product removes risk of HFC emissions
AESSEAL helps UK firm to multi-million pound savings
LabTecta FS the answer for gearbox problem
Warman conversion the answer for Spanish company
A seal conversion kit for the Warman® AH Range of Ultra Heavy Duty Slurry Pumps helped to solve a variety of problems being experienced by a Spanish aluminium producer.
CFFC™ solves reliability problem on North Sea oil platform
Rapid response saves the day for UK company
CDSA seals brings huge savings for US company
Major savings with CKD double seal
Change to packing saves Swiss company $millions
A chocolate producer in Switzerland has saved around ₣2.3 million ($2.6 million) over the past year following its decision to change to an AESSEAL pump packing system.
AESSEAL packing system brings major savings
A French pharmaceuticals company has saved over €200,000 in the first year following its decision to change to an AESSEAL reactor packing system.
Leakage problem solved with STS
AESSEAL product ends emissions penalties for Polish company
AESSEAL product brings big savings for South African company
Bitumen pump upgrade saves over £23,000 a year
Asphalt producer pump for road surfaces was gland packed and losing over 15 tonnes of bitumen.
Annual savings of over $2.6 million
LabTecta ends dust pollution problem for SA firm
Preventing dust from escaping into the working environment and is saving thousands of dollars a year