Mining company saves $8 million AUD with AESSEAL system
AU Flag
A coal mine in Australia was having seal failures roughly every two weeks on two disposal pumps.

New approach for slurry pumps reduces water usage by 95%
CD Flag
A copper mining company in central Africa was encountering problems of excessive water usage

ROI In Less Than A Month
FR Flag
a French cardboard manufacturer was experiencing seal failures every two months. AESSEAL worked closely with the customer to find the right solution.

Reliability Improved For Waste Energy Company
GB Flag
Enfinium were disappointed with the support provided by their pump OEM

AESSEAL product ends emissions penalties for Polish company
PL Flag
A Polish Petrochemical Company was paying heavy fines resulting from the escape of harmful solvents into the atmosphere.

LabTecta ends contamination problem at Australian mining company
AU Flag
An Australian mining company was encountering problems with bearing contamination in the seals on its conveyor pulleys.

AESSEAL raises spirits at UK distillery
GB Flag
An international food and beverage company was reporting frequent pump failures at one of its UK distilleries, resulting in leakage and loss of product.

CDPH & EasyClean boosts MTBF from four months to seven years
DK Flag
The installation of a CDPH double mechanical seal along with an EasyClean™ seal support system proved to be the remedy for the frequent failures of a competitor’s seal at a power plant in Denmark.

Fantastic seal life for notoriously difficult application
CA Flag
A pulp & paper company in the Canada were dissatisfied with the reliability of the mechanical seal used in its Chlorine Dioxide generator pump.

AESSEAL solves reliability problem for US paper company
US Flag
The installation of the AESSEAL DMSC double mechanical seal, a close clearance bushing, a FLOWTRUE flowmeter, and a 25 litre SW2 water management system, has solved a problem of repeated seal failure for a US paper company.

Bitumen pump upgrade saves over £23,000 a year
GB Flag

Asphalt producer pump for road surfaces was gland packed and losing over 15 tonnes of bitumen.

CURC seal saves thousands for US company
US Flag
The installation of an AESSEAL single mechanical seal helped an engineering company solve the problem of repeated seal failures.

Major reliability improvement with CSSN seals
ZA Flag
Installation of CSSN cartridge seal has resulted in a dramatic improvement in seal reliability for a South African chemical company.

AESSEAL product removes risk of HFC emissions
IT Flag
A specially designed double seal from AESSEAL has enabled an Italian drinks company to avoid the risk of major financial penalties which could have resulted from the release into the atmosphere of highly damaging HFC (hydrofluorocarbon) gases.

DMSF solves reliability issues for Swedish company
SE Flag
Elastomer degradation was causing the seals on three of the boiler feed pumps at a Swedish energy plant to fail around every 12 months.

Improving reliability, increasing efficiency
GB Flag
A leading refinery in the UK was having trouble with seal leakage from existing carbon box technology on their 150#, 600# steam turbines.

Major savings with CKD double seal
SE Flag
The single seals being used by Swedish water treatment company were unsuitable for the job they were being asked to do, allowing limescale to enter between the seal faces and leak out on to the floor of the plant.

Upgrade will result in major savings for US company
US Flag
A US petrochemical company is set to save tens of thousands of dollars a year following the installation of specially-designed seal pots to replace 40 existing pots which had been in place for around half a century.

AESSEAL helps UK firm to multi-million pound savings
GB Flag
A leading UK company is set to save more than £5 million over five years following the installation of AESSEAL LabTecta OP bearing protectors.

DMSC saves Nestlé Purina £182k in just 10 months
PL Flag
Significant savings with mechanical seal and bearing protection for the pet food manufacturer

Change to packing saves Swiss company $millions
CH Flag

A chocolate producer in Switzerland has saved around ₣2.3 million ($2.6 million) over the past year following its decision to change to an AESSEAL pump packing system.

CFFC™ solves reliability problem on North Sea oil platform
GB Flag
The installation of an AESSEAL high performance CFFC™ dual seal proved to be the solution for the persistent failure of a seal on a North Sea oil platform.

AESSEAL system fixes sewage problems for US township
US Flag

A municipality in Pennsylvania was having issues with major inefficiencies in its sewage treatment system. 

LabTecta IAP solves ash dust problem
DK Flag
The installation of a LabTecta®IAP labyrinth seal has solved a persistent problem for the Danish wastewater company Biofos Lynetten.

Annual savings of over $2.6 million
US Flag
A food and beverage customer was experiencing high leakage and contamination in their process fluid on the single pass flow through system they were operating.

Leakage problem solved with STS & ST
GB Flag
A global energy company was facing significant losses as a result of damage to the steam turbine housing at one of its ethylene plants.

AESSEAL packing system brings major savings
FR Flag

A French pharmaceuticals company has saved over €200,000 in the first year following its decision to change to an AESSEAL reactor packing system.

AESSEAL product stops hot oil pump leakage
DZ Flag
A large oil and gas company in north Africa contacted AESSEAL to look at a sealing issue on its hot oil pumps.

Exceptional service saves thousands in lost revenue
GB Flag

AESSEAL were contacted by a power plant in the UK who were experiencing a major issue with their supply of mechanical seals.

Major savings follow installation of AESSEAL product
AE Flag

A petrochemical company based in the Middle East was having problems with persistent and costly seal failures.

LabTecta FS the answer for gearbox problem
US Flag
A repair and maintenance company in West Virginia says that its customers in the local coal mining industry have recorded major savings following a decision to upgrade to AESSEAL LabTecta FS.

Major savings follow change to AESSEAL FIDC™
OM Flag
The decision to replace a competitor’s dual seal with the AESSEAL FIDC™ (Flow-Induced Dual Cartridge Seal) has saved a Middle Eastern oil company an estimated $125,460 a year since the AESSEAL® product was installed in 2019.

AESSEAL product brings big savings for South African company
ZA Flag
The installation of an AESSEAL FGDSS-N single slurry seal is saving a South African mining company thousands of dollars a year in repair and maintenance costs.

CDSA seals brings huge savings for US company
US Flag
A US paper company has saved $1.5 million over the past seven years after replacing inefficient gland packing on two of its pumps with the AESSEAL CDSA double mechanical seal and tank systems.

80 million litres of water per year to be saved at Mexican mine
MX Flag
The Grupo Mexico Caridad mine in Mexico was experiencing lengthy downtimes and using high volumes of water for lubricating pump packing.

DMSF seal the answer at South African plant
ZA Flag
The installation of the AESSEAL DMSF seal and SW2 water management system at the Ford plant in Pretoria, South Africa, has improved the MTBF of a crucial seal from less than two weeks to more than two years.

Full steam ahead for refinery after change to STS seals
GB Flag
An oil and gas refinery in northern England was experiencing poor reliability of its steam turbine.

Dangerous oil leak problem solved by LabTecta FS
ES Flag
A silicon lip seal fitted to a rubber lumps reactor at a chemical plant in northern Spain failed after just ten days, resulting in the serious leakage of oil from the gearbox.

Prompt delivery saves three-month delay
KW Flag
A 12-week delay on the commissioning of a new oil and gas plant in Kuwait was avoided when AESSEAL was able to step in to replace a defective competitor’s seal at short notice.

Chemical plant saved over €500,000 in the first year
FR Flag
A critical glue agitator vessel was affecting productivity for a silicone manufacturing facility in France. This situation was costing the company thousands of Euros in lost production.

Rapid response saves the day for UK company
GB Flag
The rapid repair of a faulty seal saved a UK pharmaceuticals company almost £2 million in lost production.

Mechanical seals runs an incredible 17 years without problems
ZA Flag
Tongaat Hullett Sugar were unhappy with the amount of maintenance required on the sealing of one of its pumps.