Frequent seal changes and heavy water use were causing operational problems and rising costs for a US pharmaceutical company.
Case Studies
A coal mine in Australia was having seal failures roughly every two weeks on two disposal pumps.
Case Studies
An oil and gas refinery in northern England was experiencing poor reliability of its steam turbine.
Case Studies
A copper mining company in central Africa was encountering problems of excessive water usage
Case Studies
A US corn milling and food additives company was reporting problems resulting from incorrectly cut bulk packing.
Case Studies
A seal failure at a US corn milling company resulted in 12 weeks of downtime when the new cartridge seal supplied by one of AESSEAL’s competitors turned out to be the wrong specification.
Case Studies
A mining company in Namibia was experiencing persistently low pressure in its gland service water system. This was causing excessive wear on the shaft sleeves.